Specifications for the following are available from Echo Floors on request:
Tiling of Echo floors
Grouting between the joints (generally undertaken by Echo Floors)
Structural topping
Levelling screed
That's great guys! Level walls wil help us to have level ceilings.
We only need a centre line of adjustable props where the clear spans exceed 5,0m. This also levels the soffits with each other. These props remain in possition for 10 days.
Clean off debris and thoroughly wet the slabs before grouting and the V-joints and casting of concrete topping or screed where specified. A detailed specification is available on request.
Ten days after casting the joints and topping, remove the props and finish the butted joint with Rhinolite and a piece of conduit or use 'Profill' or similar to prevent hairline cracks.
This is easy! No plastering required - tyrolean the ceiling before painting or apply a textured coat of paint to the ceiling.
Slabs may be Rhinolite plastered for a completely smooth soffit if required - specifications are available.